{"id":15632,"date":"2026-05-12T10:42:06","date_gmt":"2026-05-12T10:42:06","guid":{"rendered":"https:\/\/www.shaperfactory.com\/?post_type=shaper_docs&#038;p=15632"},"modified":"2026-09-09T01:55:35","modified_gmt":"2026-09-09T01:55:35","slug":"exemplo-de-apolice-custo-prazo-deducao","status":"publish","type":"shaper_docs","link":"https:\/\/www.shaperfactory.com\/pt\/shaper-docs\/sample-policy-cost-timeline-deduction","title":{"rendered":"Exemplo de pol\u00edtica: Custos, prazos e regras de dedu\u00e7\u00e3o"},"content":{"rendered":"<h2 id=\"h-two-sample-tracks-find-yours-first\" class=\"wp-block-heading\">Two Sample Tracks \u2014 Find Yours First<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Almost every question about sample cost and timing comes down to one thing: <strong>are you sampling a style we already make, or a style we&#8217;re building for you?<\/strong> The two work differently at every step.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><\/th><th><strong>Catalog sample<\/strong><\/th><th><strong>Custom development sample<\/strong><\/th><\/tr><\/thead><tbody><tr><td>What it is<\/td><td>A style from our existing catalog, as shown<\/td><td>A style built to your spec, or an existing style with changes<\/td><\/tr><tr><td>Taxa<\/td><td>$7\u201315 per piece, plus logo application if branded<\/td><td>$50\u2013120 per piece, by construction<\/td><\/tr><tr><td>Cronologia<\/td><td>1\u20133 business days as shown, 3\u20137 with your logo<\/td><td>7\u201314 business days from confirmed spec<\/td><\/tr><tr><td>Fee deductible?<\/td><td>No \u2014 catalog pricing carries no development cost<\/td><td>Yes, against a qualifying bulk order<\/td><\/tr><tr><td>Who it&#8217;s for<\/td><td>Wholesale buyers, resellers, first-time buyers testing quality<\/td><td>Brands developing their own product<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">If you&#8217;re not sure which track you&#8217;re on: if you can point at a product on our site and say &#8220;that one, as is,&#8221; it&#8217;s a catalog sample. Anything else \u2014 new color, your own fabric, changed construction \u2014 is development.<\/p>\n\n\n\n<h2 id=\"h-sample-fees\" class=\"wp-block-heading\">Exemplos de taxas<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tipo de amostra<\/th><th>Taxa<\/th><th>Why it costs what it costs<\/th><\/tr><\/thead><tbody><tr><td>Catalog style, as shown<\/td><td><strong>$7\u201315 \/ unidade<\/strong><\/td><td>Already in production. No setup, no development.<\/td><\/tr><tr><td>Catalog style with your logo<\/td><td><strong>$7\u201315 \/ unidade<\/strong> + logo application, charged separately (below)<\/td><td>The garment already exists \u2014 branding is priced on its own<\/td><\/tr><tr><td>Catalog style, new color (seamless)<\/td><td><strong>$50\u2013100 \/ cor<\/strong><\/td><td>Yarn sourcing and machine parameter adjustment for the new colorway<\/td><\/tr><tr><td>New custom design, cut-and-sew<\/td><td><strong>$50\u201380 \/ unidade<\/strong><\/td><td>Pattern making and sewing setup \u2014 lower tooling cost than seamless<\/td><\/tr><tr><td>New custom design, seamless<\/td><td><strong>$80\u2013120 \/ unidade<\/strong><\/td><td>Full development cycle: new mold, machine programming, trial runs<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The gap between $15 and $120 is tooling, not margin.<\/strong> Catalog styles run on molds that already exist. A new seamless design needs a mold built and a Santoni machine programmed for your spec before a single piece exists \u2014 that cost lands on the first sample whether you order one piece or ten.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is also why the two construction methods price differently. Cut-and-sew works from patterns and fabric already in house. Seamless circular-knit is a machine setup. Same reason their bulk minimums differ.<\/p>\n\n\n\n<h3 id=\"h-logo-application-on-sample-orders\" class=\"wp-block-heading\">Logo application on sample orders<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is charged <strong>separately from the garment<\/strong> \u2014 the figures below cover branding only, not the sample itself.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Sample pieces<\/th><th>Logo application, per piece<\/th><\/tr><\/thead><tbody><tr><td>1 piece<\/td><td>around $10<\/td><\/tr><tr><td>3\u20135 pieces<\/td><td>$3\u20135<\/td><\/tr><tr><td>Production quantities<\/td><td>quoted with your order<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Two things sit behind that price: a one-time setup per design (film, screen, or plate for your artwork), and an operator applying and checking each piece by hand. On a single sample, the setup lands entirely on that one piece. Across a few, it spreads out \u2014 which is why the per-piece figure drops so sharply between one and five.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>If you&#8217;re branding samples at all, order a few rather than one.<\/strong> Five pieces costs roughly the same in total as two at single-piece pricing, and leaves you with samples to photograph, show buyers, or send to a partner.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These figures apply to the sampling stage only. Branded orders from our catalog start at 50 pieces, where logo application is quoted as part of the unit price rather than charged separately.<\/p>\n\n\n\n<h3 id=\"h-rush-service\" class=\"wp-block-heading\">Rush service<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Sampling can be expedited for <strong>$100 per sample order<\/strong>. Useful when you&#8217;re working against a launch date or a peak-season deadline. Tell your sales contact at inquiry \u2014 rush capacity depends on current scheduling, so it&#8217;s confirmed case by case rather than guaranteed.<\/p>\n\n\n\n<h3 id=\"h-shipping\" class=\"wp-block-heading\">Envio<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sample fees don&#8217;t include shipping.<\/strong> Freight is quoted separately by destination, or you can send us your own courier account number and we&#8217;ll ship on it. Sample shipments go by express courier \u2014 see <a href=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/opcoes-de-envio-da-nanbin\" target=\"_blank\" rel=\"noreferrer noopener\">Op\u00e7\u00f5es de envio<\/a> for how bulk freight differs.<\/p>\n\n\n\n<h2 id=\"h-sample-deduction-rules\" class=\"wp-block-heading\">Exemplos de regras de dedu\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>This applies to custom and OEM orders.<\/strong> Sample fees on wholesale catalog orders are not deductible \u2014 catalog styles are already priced at wholesale, with no development cost built into the unit price. There&#8217;s nothing to credit back.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For custom and OEM development, your sample fee is not a sunk cost. <strong>It&#8217;s fully credited against your bulk order.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Conditions:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The bulk order reaches that style&#8217;s production minimum<\/li>\n\n\n\n<li>For custom and OEM orders, <strong>the sample fee is credited from around 200 pieces<\/strong> where the fabric is already in house. This isn&#8217;t an automatic rule \u2014 ask your sales contact whether your order qualifies.<\/li>\n\n\n\n<li>The credit is applied to your final payment, not the deposit<\/li>\n\n\n\n<li><strong>New clients qualify on their first bulk order<\/strong> \u2014 you don&#8217;t need order history with us<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The logic: the sample fee exists to cover development. Once you commit to production, that development is paid for by the order itself, so we hand the fee back.<\/p>\n\n\n\n<h3 id=\"h-established-accounts\" class=\"wp-block-heading\">Established accounts<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Clients with annual purchases above <strong>$500,000<\/strong> receive samples at no charge. Above <strong>$300,000<\/strong>, complimentary samples are available on request. Either way, we verify against your purchase history in our own system \u2014 there&#8217;s no application or paperwork on your side.<\/p>\n\n\n\n<h2 id=\"h-sample-timeline\" class=\"wp-block-heading\">Exemplo de cronograma<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">All timelines below are <strong>business days<\/strong>, not calendar days. Chinese New Year is the one period where these windows extend meaningfully \u2014 your sales contact will confirm dates in advance.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>What you&#8217;re sampling<\/th><th>Hora<\/th><th>Clock starts<\/th><\/tr><\/thead><tbody><tr><td>Catalog style, as shown<\/td><td><strong>1\u20133 business days<\/strong><\/td><td>Payment received<\/td><\/tr><tr><td>Catalog style with your logo<\/td><td><strong>3\u20137 business days<\/strong><\/td><td>Payment received and artwork confirmed<\/td><\/tr><tr><td>New color, or a style built to your spec<\/td><td><strong>7\u201314 business days<\/strong><\/td><td>Full spec confirmed<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 id=\"h-catalog-style-as-shown-1-3-days\" class=\"wp-block-heading\">Catalog style, as shown: 1\u20133 days<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">These are held in stock, so there&#8217;s no sampling cycle at all \u2014 we&#8217;re packing, not making. This is the fastest way to get our product in your hands and check fabric weight, compression, and grading before committing to anything.<\/p>\n\n\n\n<h3 id=\"h-catalog-style-with-your-logo-3-7-days\" class=\"wp-block-heading\">Catalog style with your logo: 3\u20137 days<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The product already exists; we&#8217;re applying your branding to it. The clock starts once payment is in and your artwork and placement are confirmed \u2014 so send print-ready files rather than a screenshot if you want the short end of that range.<\/p>\n\n\n\n<h3 id=\"h-new-color-or-new-style-7-14-days\" class=\"wp-block-heading\">New color or new style: 7\u201314 days<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This is where actual development happens \u2014 sourcing yarn for your color, adjusting machine parameters, or making patterns for a new style. The clock starts <strong>once requirements and technical details are confirmed<\/strong>, not when you first contact us. Spec confirmation usually takes a round or two of questions about fabric, grading, and construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What pushes it toward 14 rather than 7:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Style complexity \u2014 new construction takes longer than a variation on an existing block<\/li>\n\n\n\n<li>Specialty fabric or trims we need to source<\/li>\n\n\n\n<li>Seamless rather than cut-and-sew \u2014 machine setup is part of the cycle<\/li>\n\n\n\n<li>Current production scheduling \u2014 <strong>Q3 and Q4 run tight<\/strong>, plan earlier if you&#8217;re targeting peak season<\/li>\n<\/ul>\n\n\n\n<h3 id=\"h-revisions-1-free\" class=\"wp-block-heading\">Revisions: 1 free<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">If the first sample doesn&#8217;t match what you had in mind, tell us what needs to change and we&#8217;ll remake it at no charge. The revised sample runs on the same cycle as the original, so budget for a second round in your timeline \u2014 one revision is normal, not a sign something went wrong.<\/p>\n\n\n\n<h2 id=\"h-payment-and-handover\" class=\"wp-block-heading\">Payment and Handover<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sample orders are paid in full up front.<\/strong> The amounts are small enough that splitting them adds more admin than it&#8217;s worth, and the timelines above run from that payment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Bulk orders work in two steps:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Deposit, typically 30% \u2014 we start.<\/strong> Production is scheduled as soon as the deposit clears. You don&#8217;t wait for the balance to get into the queue.<\/li>\n\n\n\n<li><strong>Balance paid in full \u2014 we ship.<\/strong> Shipping timelines start from full payment, not from order placement.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The practical effect on a bulk order: it&#8217;s being made while you&#8217;re arranging the balance, so it&#8217;s ready to move the moment payment lands rather than starting from zero.<\/p>\n\n\n\n<h2 id=\"h-what-we-need-from-you\" class=\"wp-block-heading\">What We Need From You<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To quote a sample fee and timeline, send:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Estilo<\/strong> \u2014 a description, reference images, or a link to the catalog style<\/li>\n\n\n\n<li><strong>Fabric and color<\/strong> \u2014 target fabric, and Pantone reference if you have one<\/li>\n\n\n\n<li><strong>Tamanhos<\/strong> \u2014 which sizes, and your own size chart if you have one<\/li>\n\n\n\n<li><strong>Logo and packaging<\/strong> \u2014 placement, method (heat transfer, woven label, embroidery), and any packaging requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The more of this that arrives up front, the sooner the clock starts. For a full checklist, see <a href=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/what-to-prepare-before-requesting-a-sample\" target=\"_blank\" rel=\"noreferrer noopener\">O que preparar antes de solicitar uma amostra<\/a>.<\/p>\n\n\n\n<h2 id=\"h-after-you-approve-the-sample\" class=\"wp-block-heading\">After You Approve the Sample<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Bulk production runs about 25 business days. The clock starts when full payment clears, not at sample approval \u2014 see the payment section above. Fully custom programs can run longer depending on fabric sourcing and how many specs are still open at approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Minimums at that stage depend on how much of the product is yours:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Minimums at that stage depend on how much of the product is yours \u2014 catalog styles start at 20 pieces unbranded and 50 with your logo, counted across the whole order, while anything built to your spec is counted per style and per color. See <a href=\"\/pt\/documentacao-do-shaper\/quantidade-minima-de-encomenda-moq-de-roupa-modeladora-por-nivel-de-personalizacao\">Quantidade m\u00ednima de encomenda (MOQ) de roupa modeladora por n\u00edvel de personaliza\u00e7\u00e3o<\/a> for the full tier table and how each tier is counted.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">See <a href=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/prazos-de-entrega-da-producao\" target=\"_blank\" rel=\"noreferrer noopener\">Production and Shipping Lead Times<\/a> for the full bulk timeline, and <a href=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/modelos-em-stock-vs-designs-personalizados\" target=\"_blank\" rel=\"noreferrer noopener\">Stock Styles vs Custom Designs<\/a> if you&#8217;re still deciding which route fits.<\/p>\n\n\n\n<h2 id=\"h-faq\" class=\"wp-block-heading\">Perguntas frequentes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A taxa da amostra pode ser reembolsada?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s a credit, not a refund. For custom and OEM orders, the fee comes off your final payment once the bulk order meets the threshold. Catalog sample fees aren&#8217;t credited \u2014 catalog pricing doesn&#8217;t carry development cost to begin with.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Que quantidade por encomenda d\u00e1 direito \u00e0 dedu\u00e7\u00e3o?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For custom and OEM orders, from around 200 pieces where the fabric is already in house; otherwise that style&#8217;s production minimum. It&#8217;s not an automatic rule, so ask your sales contact whether your order qualifies. New clients qualify on their first bulk order \u2014 worth asking, since it depends on current stock. New clients qualify on their first bulk order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>E se eu n\u00e3o ficar satisfeito com a amostra?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One free revision is included. Tell us specifically what needs to change \u2014 measurements, compression, fabric hand, color \u2014 and we&#8217;ll remake it at no charge on the same cycle as the original sample.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A taxa da amostra inclui os portes de envio?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No. Freight is quoted separately by destination, or you can ship on your own courier account.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How fast can I get a sample if I&#8217;m on a deadline?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Catalog styles ship in 1\u20133 business days with no rush fee, and 3\u20137 with your logo on them. Development samples run 7\u201314 business days and can be expedited for $100, subject to current scheduling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can I order samples in multiple sizes or colors?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Each size or colorway is priced as a separate sample. For seamless color changes, the $50\u2013100 fee is per color, not per piece.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Do I need a sample before placing a bulk order?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not required, but strongly recommended for anything custom. For unbranded catalog styles, many buyers skip the formal sample entirely and place a small wholesale order instead \u2014 you pay normal wholesale pricing rather than a sample fee, and what arrives is sellable stock.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What happens to the sample after approval?<\/strong> <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That depends on what you want it to do. If the sample is meant to set the production standard, we keep an approved reference in house and check the bulk run against it \u2014 a physical benchmark rather than just a spec sheet. Say so at approval and we&#8217;ll record it. Otherwise the sample is simply yours to keep.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ready to sample? <a href=\"https:\/\/www.shaperfactory.com\/pt\/contacto\">Contac<\/a><a href=\"https:\/\/www.shaperfactory.com\/pt\/contacto\" target=\"_blank\" rel=\"noreferrer noopener\">t<\/a><a href=\"https:\/\/www.shaperfactory.com\/pt\/contacto\"> us<\/a> with your style requirements and target market, and we&#8217;ll come back with a sample fee, timeline, and the minimums that apply to your route.<\/p>","protected":false},"excerpt":{"rendered":"<p>Two Sample Tracks \u2014 Find Yours First Almost every question about sample cost and timing comes down to one thing: are you sampling a style we already make, or a style we&#8217;re building for you? The two work differently at every step. Catalog sample Custom development sample What it is A style from our existing [&hellip;]<\/p>\n","protected":false},"featured_media":0,"menu_order":0,"template":"","doc_category":[135165],"class_list":["post-15632","shaper_docs","type-shaper_docs","status-publish","hentry","doc_category-buyer-guide"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.4 (Yoast SEO v28.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Shapewear Sample Policy: Costs, Lead Times &amp; Deduction<\/title>\n<meta name=\"description\" content=\"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/exemplo-de-apolice-custo-prazo-deducao\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sample Policy: Cost, Timeline, and Deduction Rules\" \/>\n<meta property=\"og:description\" content=\"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/exemplo-de-apolice-custo-prazo-deducao\" \/>\n<meta property=\"og:site_name\" content=\"Nanbin Shapewear Manufacturer\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-09T01:55:35+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\\\/sample-policy-cost-timeline-deduction\",\"url\":\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\\\/sample-policy-cost-timeline-deduction\",\"name\":\"Shapewear Sample Policy: Costs, Lead Times & Deduction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#website\"},\"datePublished\":\"2026-05-12T10:42:06+00:00\",\"dateModified\":\"2026-09-09T01:55:35+00:00\",\"description\":\"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\\\/sample-policy-cost-timeline-deduction#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\\\/sample-policy-cost-timeline-deduction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\\\/sample-policy-cost-timeline-deduction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.shaperfactory.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/www.shaperfactory.com\\\/shaper-docs\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sample Policy: Cost, Timeline, and Deduction Rules\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#website\",\"url\":\"https:\\\/\\\/www.shaperfactory.com\\\/\",\"name\":\"Nanbin Fashion Shapewear manufacturer\",\"description\":\"Nanbin is a certified OEM bodysuit &amp; shapewear manufacturer .\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#organization\"},\"alternateName\":\"Shapewear manufacturer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.shaperfactory.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#organization\",\"name\":\"Nanbin Fashion Shapewear Factory\",\"url\":\"https:\\\/\\\/www.shaperfactory.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.shaperfactory.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/nanbin-shapewear-factory-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.shaperfactory.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/nanbin-shapewear-factory-logo.png\",\"width\":220,\"height\":86,\"caption\":\"Nanbin Fashion Shapewear Factory\"},\"image\":{\"@id\":\"https:\\\/\\\/www.shaperfactory.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Shapewear Sample Policy: Costs, Lead Times & Deduction","description":"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/exemplo-de-apolice-custo-prazo-deducao","og_locale":"pt_PT","og_type":"article","og_title":"Sample Policy: Cost, Timeline, and Deduction Rules","og_description":"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.","og_url":"https:\/\/www.shaperfactory.com\/pt\/documentacao-do-shaper\/exemplo-de-apolice-custo-prazo-deducao","og_site_name":"Nanbin Shapewear Manufacturer","article_modified_time":"2026-09-09T01:55:35+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.shaperfactory.com\/shaper-docs\/sample-policy-cost-timeline-deduction","url":"https:\/\/www.shaperfactory.com\/shaper-docs\/sample-policy-cost-timeline-deduction","name":"Shapewear Sample Policy: Costs, Lead Times & Deduction","isPartOf":{"@id":"https:\/\/www.shaperfactory.com\/#website"},"datePublished":"2026-05-12T10:42:06+00:00","dateModified":"2026-09-09T01:55:35+00:00","description":"How sampling works at Nanbin \u2014 what a sample costs, how fast it ships, and when the fee comes back to you. Know before you commit to a production run.","breadcrumb":{"@id":"https:\/\/www.shaperfactory.com\/shaper-docs\/sample-policy-cost-timeline-deduction#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.shaperfactory.com\/shaper-docs\/sample-policy-cost-timeline-deduction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.shaperfactory.com\/shaper-docs\/sample-policy-cost-timeline-deduction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.shaperfactory.com\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/www.shaperfactory.com\/shaper-docs"},{"@type":"ListItem","position":3,"name":"Sample Policy: Cost, Timeline, and Deduction Rules"}]},{"@type":"WebSite","@id":"https:\/\/www.shaperfactory.com\/#website","url":"https:\/\/www.shaperfactory.com\/","name":"Fabricante de roupa modeladora Nanbin Fashion","description":"A Nanbin \u00e9 um fabricante certificado de fatos de banho e roupa modeladora para o mercado OEM. .","publisher":{"@id":"https:\/\/www.shaperfactory.com\/#organization"},"alternateName":"Shapewear manufacturer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.shaperfactory.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/www.shaperfactory.com\/#organization","name":"F\u00e1brica de Roupa Modeladora Nanbin Fashion","url":"https:\/\/www.shaperfactory.com\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/www.shaperfactory.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.shaperfactory.com\/wp-content\/uploads\/2026\/08\/nanbin-shapewear-factory-logo.png","contentUrl":"https:\/\/www.shaperfactory.com\/wp-content\/uploads\/2026\/08\/nanbin-shapewear-factory-logo.png","width":220,"height":86,"caption":"Nanbin Fashion Shapewear Factory"},"image":{"@id":"https:\/\/www.shaperfactory.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.shaperfactory.com\/pt\/wp-json\/wp\/v2\/shaper_docs\/15632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.shaperfactory.com\/pt\/wp-json\/wp\/v2\/shaper_docs"}],"about":[{"href":"https:\/\/www.shaperfactory.com\/pt\/wp-json\/wp\/v2\/types\/shaper_docs"}],"wp:attachment":[{"href":"https:\/\/www.shaperfactory.com\/pt\/wp-json\/wp\/v2\/media?parent=15632"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/www.shaperfactory.com\/pt\/wp-json\/wp\/v2\/doc_category?post=15632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}